|
|
|
 |
|
1893 VINEYARD CAT (DOLPHIN)
|
|
DOLPHIN CABIN (Page 6)
|
 |
|
|
|
| STEAMING, BENDING AND GLUING FIRST LAYER OF 3/8" MAHOGENY BOARDS |



|
| CUTTING OUT ELIPTICAL PORT HOLES |

|
| STARTING CABIN TOP BEAMS |

|
| BEADED CABIN T&G DOUGLAS FIR |


|
|
| GLASSING OVER 2 LAYER MARINE PLY FOR CABINE TOP |
|
|
| BOLTING IN 1889 REBUILT DOUBLE WORM GEAR |
|
|
| STEAMING THE TOE & RUB RAILS ON |

|
|
| MOVING TO A NEW LOCATION TO DO THE INTERIOR |

|
| STARTING INTERIOR |


|
| TRAILER DUTY |


|
| LAUNCH DAY |






|
| DOWNWIND WITH LIGHT AIR |




Enter subhead content here

|
 |
 |
 |
|

Enter content here

|
 |
 |
 |
|
Enter content here
|
|
 |
 |
 |
 |
|
Enter content here
|
 |
 |
 |
|
Enter content here
|
|
 |
 |
 |
|

Enter supporting content here
|
|