|
1893 VINEYARD CAT (DOLPHIN)
|
|
PLANKING DOLPHIN (PP.5)
|
 |
|
Enter subhead content here
|
 |
 |
 |
|







Enter content here
|
 |
 |
 |
|
Enter content here


|
|
 |
 |
 |
 |
|
Enter content here
|
 |
 |
 |
|
Enter content here
|
|
 |
 |
 |
|
|
|
| INTERIOR CEDAR CEILING LAID IN |

|
|
| CENTERBOARD TRUNK MAHOGENY BEING BOLTED TO FLANGE |


|
| ENGINE BEING BOLTED IN |

|
| COCKPIT FLOOR BEAMS BOLTED IN |

|
| REAR DECK BEAMS |

|
| SIDE DECK BEAMS |


|
|
| PUTTING DOWN THE MARINE PLYWOOD 2 OVERLAPPING LAYERS |

|
| PUTTING ON THE DYNEL (FIBERGLASS CLOTH) |



|
|
| STARTING ON THE COCKPIT COAMING BEADED T&G MAHOGENY |
|
|
| STARTING THE MAHGOGENY FOR CABIN COAMING |
Enter supporting content here
|